top of page

Hanco's full line of switch stick testers ensure line worker protection with full stick voltage testing

  • The units are available in front-loading or top-loading models (low profile units)

  • Portable units are also available, offering a locking ability to test any size stick while also folding down to a compact size

  • Units provide a full high voltage electrical test of sticks (as required by OSHA)

  • Sticks can be tested wet or dry

  • Stick testers are available in widths of 14 or 21 feet and can accommodate from one through six units

  • Test units are available for stick testing, as well as combination test which test all of hose or sticks in the same unit

  • Portable fiberglass stick tester models are available in 4', 5' and 6' models which can interconnect to test the complete stick length, while also being able to fold to a convenient, compact size

  • Portable Stick Tester may be sold by itself or as a combination unit with a 0-50KVAC High Voltage, Inc. hipot

Switch Stick Testing Equipment

Portable

These Portable Stick Testing Racks can be joined together by a rubber latch to effectively test any length of stick depending on the amount of racks you have in a line.

  • All of the racks have locking hinges and fold down to 5" deep for easy transportation

  • Option to purchase as a set with a Hipot thanks to our partners at High Voltage Inc.

  • Will hold up to 50 KVAC for a full test cycle

  • 4', 5', and 6' options

  • Easily attach multiple testing racks to test any length of Sticks

  • Quick and simple setup procedure

Standard Features

  • Automatic: digital fault detection, digital load sensing, digital leakage readout and power cycle

  • Standard 50KVAC power supply with optional 100KVDC power supply or a combination for both AC and DC testing

  • The high voltage test compartment contains mechanical grounding devices and safety interlock system with audible and visual warning signals covering all entries into the test cabinet for full operator safety and protection.

  • Microprocessor-controlled

  • All cabinets are made with formed 12-gauge steel, coated with primer and two coats of epoxy paint. Cabinets are rust and corrosion resistant

  • Leakage reading with a single set point for all test positions

  • Leakage digital milliamp monitor during the entire duration of the test

  • Voltmeters programmed to save peak voltage

  • Digital cycle timer

  • Control system has option for either manual or automatic cycle operation

  • Automatic ozone depletion and dispersal system with programmed delays to insure complete removal of ozone from the testing cabinet

  • PLC is self-diagnostic

  • Digital voltmeter indicator

  • Insufficient air pressure warning indication

  • Standard input voltage is 240V single phase with other inputs optional (specify when ordering)

  • Standard A.B. Panelview control system with full color display

Standard

Description

Hanco Also Offers: 

  • CAD-designed lab layouts with all equipment needed for a turnkey lab operation

  • Technical phone support

  • Complete field service support

  • On-site operator training and certification

  • On-site equipment calibration, inspection and certification (as required by ASTM and OSHA). All systems are checked as required for full compliance.

Tri fab logo GIF.gif

All of our cabinets are locally manufactured by our partners at Tri-Fab, Inc.

bottom of page